schiemann weyers

architects

Installation Fashion Hotel, Amsterdam, NL

The temporary installation anticipates on a footbridge to be built in the near future, as described in the urban masterplan ‘Framework Lelylaan’. The construction consists of two layers of profiled sheets with a layer of climbing plants in between. The inner sheet is made out of steel, retaining the soil, while the outer sheet is made out of translucent polycarbonate, interfering with vegetation and steel wall. The upper surface of the installation is part of the entrance zone of the WestCord Fashion Hotel and can be used as an exterior lobby.
1 2 3 4 5 6 data